Here are the initial steps with the base ready, corners cut on the router table, and two cuts on the band saw. Next comes the locating holes for positioning on the 5/8 in. round posts.

At the Vollis Simpson Whirligig MuseumPark Project the Reflector box is going further with the reflector blocks treated with a linseed oil bath for durability and ready to go. Clark is going down the rows to photograph color coded dots for position assignments. Brad is transferring the reflector panels and the process is shown on the story board and another photo station will record each block as it is completed as it comers off the bench and again when put back in place. (Danny found a whirligig that an old friend made for him and placed it in the shop! Nifty).

0 comments:
Post a Comment